Traffic Impact Assessment Residential and Commercial Complex development at Pointe Aux Canonniers

Project Value: MUR 500 Million
Period: 2014-On-going

 

Responsible for detailed design and supervision of works

 

Project components involved:

  • Water Reticulation network including individual 264 house connections, 1000m3 capacity below ground rectangular reinforced concrete reservoir
  • Electrical works including underground cabling and individual house supply
  • Telecommunication services (ducting, drawboxes and cubicles)
  • Roadworks (12,000 m2) including drainage, road marking, street lighting
  • Sewerage network involving pipe reticulation, lifting station, offsite works and house connections
  • Project Buildings

 

The following main parameters were considered within the TIA study:

  • Traffic Data Collection and Analysis(traffic count, physical road measurement, intersection survey)
  • Generation of traffic forecasts and traffic patterns
  • Desk studies involving traffic simulation and actual on site traffic counts
  • Mitigation measures for reduction of number of conflicts, minimization of conflict areas
  • Formulation of recommendations as a result of the findings